1. Specification, procurement, installation and maintenance of measuring equipment 10 sites in Croatia and Bosnia, 2006-2007 3 sites in Bosnia, 2006-2007 5 sites in Croatia, 2006-2007 4 sites Montenegro, 2008 4 sites in Croatia, 2009 3 sites in Serbia, 2009 2 sites in Croatia, 2010 2. Wind resource and annual energy yield assessment Wind measurements data analysis - 10 locations in Croatia and Bosnia and Herzegovina, 2006/07 Basic concept / layout 10 wind farms in Croatia, 2005 Basic Concept / layout for 5 wind farms in Croatia, 2005 Wind farm design and layout optimization – Krnovo 1/2/3/4 - Montenegro (190 MW), 2008 Additional optimization of Krnovo 1 layout for Mitsubishi Heavy - Montenegro (72 MW), 2009 Wind measurements data analysis , design and layout optimization, energy yield assessment, VE Pakline – Bosnia and Herzegovina (147 MW), 2009 Wind measurements data analysis, design and layout optimization, energy yield assessment, VE Ljubuša - Bosnia and Herzegovina (110 MW), 2009 Wind measurements data analysis, design and layout optimization, energy yield assessment, VE Kupres - Bosnia and Herzegovina (78 MW), 2009 Wind measurements data analysis, design and layout optimization, energy yield assessment, VE Ivovik - Bosnia and Herzegovina (48 MW), 2009 Basic Concept / layout for 2 wind farms, Serbia, 2009 Wind resource and annual energy yield assessment – final report - Krnovo1/2 - Montenegro (127 MW), 2009 3. Wind farm site selection and initial assessment Locations for new wind turbines KVT-51/750 (Koncar), 2004 16 locations for wind farms in Croatia and Bosnia and Herzegovina (Dalekovod), 2005 5 locations for wind farms in - Bosnia and Herzegovina (Ivovik doo, Kamen dent), 2006 5 locations for wind farms in Croatia (TEC Ltd.), 2006 5 locations for wind farms in Montenegro (Ivicom consulting), 2008 9 locations for wind farms in Croatia (HEP OIE), 2008 3 locations for wind farms in Kosovo (Ivicom consulting), 2008 3 locations for wind farms in Serbia (Ivicom consulting), 2009 5 locations for wind farms in Croatia (HEP OIE), 2009 4. Documentation for obtaining Preliminary Energy Approval (development concession) in Croatia and in Bosnia and Herzegovina 19 locations in Croatia (set of documentation for Preliminary Energy Approval) 2008-2010 4 locations in BiH (obtaining the concession), 2007-2008 5. Feasibility studies, cost estimates, due diligence Prefeasibility study wind Ivovik, 2006/09 Estimation of development costs, investment costs and market value for WF Glunča, 2008/2010 Estimation of development costs, investment costs and market value for WF Crno brdo, 2008 Assessment of wind portfolio - audit, detailed technical due diligence for two WF and a short due diligence for 14 WF, 2008-2009 Prefeasibility study WF Pakline, 2009 Prefeasibility study WF Ljubuša, 2009. Prefeasibility study WF Kupres, 2009. Estimation of development costs, investment costs and the market value of wind power portfolio of TEC RES Ltd., 2010 6. Grid connection studies WF Trtar-Krtolin grid connection study (11MW), 2003 WF Orlice wind grid connection study (16 / 10 MW), 2003/2005/2006 WF Stupisce grid connection study (5MW), 2003 WF Velika glava and WF Mravinjac - preliminary grid connection alternatives (18/50 MW), 2004 WF Pometeno brdo preliminary grid connection alternatives (1/16MW), 2005 WF Ponikve grid connection study (34 MW), 2005/2008 WF KPA – Pađene grid connection study (180 MW / 142 MW), 2006/2009 WF LBV preliminary grid connection alternatives (40 MW), 2006 WF VUP and RAV preliminary grid connection alternatives (40/70 MW), 2006 WF Svilaja grid connection study (64 MW), 2006 Preliminary alternatives for grid connection (6 locations), 2006 WF Glunča grid connection study (23 MW), 2007 WF Vrbnik grid connection study (60 MW), 2007 Preliminary alternatives for grid connection (8 sites), 2007 Preliminary alternatives for grid connection (17 locations), 2007 WF Crno brdo grid connection study (10 MW), 2008 WF Jelinak grid connection study (30 MW), 2008 WF Visoka grid connection study (28.5 MW), 2008 WF Katuni grid connection study (42 MW), 2009, 2010 WF Lukovac grid connection study (48 MW), 2009, 2010 WF Oton Bender preliminary grid connection alternatives (36 MW), 2010 WF Ljubac preliminary grid connection alternatives (36 MW), 2010 WF Kozjak grid connection study (36 MW), 2010 7, Other - General support for wind projects in development for different investors Consulting - Economic, legal and regulatory issues Obtaining energy and other permits, consents, approvals Assessment of projects, risk assessment, due diligence Cartography, digitization, vectorisation, GIS, 3D visualization, googleearth applications Inputs for Environmental impact studies Cost estimation, project planning Investigation, background studies and calculations for design documentation Preparation of project documentation Obtaining location and building permits Contracting right of land usa Tender preparation and offers evaluation General technical and logistical support Key personnel: PhD Ranko Goic, B.Sc. PhD Eugen Mudnić, B.Sc. Dino Lovric, univ.bacc.ing.el. |
| Copyright © 2008 InfoTech d.o.o., All Rights Reserved ® |