References


1. Specification, procurement, installation and maintenance of measuring equipment

10 sites in Croatia and Bosnia, 2006-2007
3 sites in Bosnia, 2006-2007
5 sites in Croatia, 2006-2007
4 sites Montenegro, 2008
4 sites in Croatia, 2009
3 sites in Serbia, 2009
2 sites in Croatia, 2010

2. Wind resource and annual energy yield assessment

Wind measurements data analysis - 10 locations in Croatia and Bosnia and Herzegovina, 2006/07
Basic concept / layout 10 wind farms in Croatia, 2005
Basic Concept / layout for 5 wind farms in Croatia, 2005
Wind farm design and layout optimization – Krnovo 1/2/3/4 - Montenegro (190 MW), 2008
Additional optimization of Krnovo 1 layout for Mitsubishi Heavy - Montenegro (72 MW), 2009
Wind measurements data analysis , design and layout optimization, energy yield assessment, VE Pakline – Bosnia and Herzegovina (147 MW), 2009
Wind measurements data analysis, design and layout optimization, energy yield assessment, VE Ljubuša - Bosnia and Herzegovina (110 MW), 2009
Wind measurements data analysis, design and layout optimization, energy yield assessment, VE Kupres - Bosnia and Herzegovina (78 MW), 2009
Wind measurements data analysis, design and layout optimization, energy yield assessment, VE Ivovik - Bosnia and Herzegovina (48 MW), 2009
Basic Concept / layout for 2 wind farms, Serbia, 2009
Wind resource and annual energy yield assessment – final report - Krnovo1/2 - Montenegro (127 MW), 2009

3. Wind farm site selection and initial assessment

Locations for new wind turbines KVT-51/750 (Koncar), 2004
16 locations for wind farms in Croatia and Bosnia and Herzegovina (Dalekovod), 2005
5 locations for wind farms in - Bosnia and Herzegovina (Ivovik doo, Kamen dent), 2006
5 locations for wind farms in Croatia (TEC Ltd.), 2006
5 locations for wind farms in Montenegro (Ivicom consulting), 2008
9 locations for wind farms in Croatia (HEP OIE), 2008
3 locations for wind farms in Kosovo (Ivicom consulting), 2008
3 locations for wind farms in Serbia (Ivicom consulting), 2009
5 locations for wind farms in Croatia (HEP OIE), 2009

4. Documentation for obtaining Preliminary Energy Approval (development concession) in Croatia and in Bosnia and Herzegovina

19 locations in Croatia (set of documentation for Preliminary Energy Approval) 2008-2010
4 locations in BiH (obtaining the concession), 2007-2008

5. Feasibility studies, cost estimates, due diligence

Prefeasibility study wind Ivovik, 2006/09
Estimation of development costs, investment costs and market value for WF Glunča, 2008/2010
Estimation of development costs, investment costs and market value for WF Crno brdo, 2008
Assessment of wind portfolio - audit, detailed technical due diligence for two WF and a short due diligence for 14 WF, 2008-2009
Prefeasibility study WF Pakline, 2009
Prefeasibility study WF Ljubuša, 2009.
Prefeasibility study WF Kupres, 2009.
Estimation of development costs, investment costs and the market value of wind power portfolio of TEC RES Ltd., 2010

6. Grid connection studies

WF Trtar-Krtolin grid connection study (11MW), 2003
WF Orlice wind grid connection study (16 / 10 MW), 2003/2005/2006
WF Stupisce grid connection study (5MW), 2003
WF Velika glava and WF Mravinjac - preliminary grid connection alternatives (18/50 MW), 2004
WF Pometeno brdo preliminary grid connection alternatives (1/16MW), 2005
WF Ponikve grid connection study (34 MW), 2005/2008
WF KPA – Pađene grid connection study (180 MW / 142 MW), 2006/2009
WF LBV preliminary grid connection alternatives (40 MW), 2006
WF VUP and RAV preliminary grid connection alternatives (40/70 MW), 2006
WF Svilaja grid connection study (64 MW), 2006
Preliminary alternatives for grid connection (6 locations), 2006
WF Glunča grid connection study (23 MW), 2007
WF Vrbnik grid connection study (60 MW), 2007
Preliminary alternatives for grid connection (8 sites), 2007
Preliminary alternatives for grid connection (17 locations), 2007
WF Crno brdo grid connection study (10 MW), 2008
WF Jelinak grid connection study (30 MW), 2008
WF Visoka grid connection study (28.5 MW), 2008
WF Katuni grid connection study (42 MW), 2009, 2010
WF Lukovac grid connection study (48 MW), 2009, 2010
WF Oton Bender preliminary grid connection alternatives (36 MW), 2010
WF Ljubac preliminary grid connection alternatives (36 MW), 2010
WF Kozjak grid connection study (36 MW), 2010

7, Other - General support for wind projects in development for different investors

Consulting - Economic, legal and regulatory issues
Obtaining energy and other permits, consents, approvals
Assessment of projects, risk assessment, due diligence
Cartography, digitization, vectorisation, GIS, 3D visualization, googleearth applications
Inputs for Environmental impact studies
Cost estimation, project planning
Investigation, background studies and calculations for design documentation
Preparation of project documentation
Obtaining location and building permits
Contracting right of land usa
Tender preparation and offers evaluation
General technical and logistical support

Key personnel:

PhD Ranko Goic, B.Sc.
PhD Eugen Mudnić, B.Sc.
Dino Lovric, univ.bacc.ing.el.